Hydro Spill Tables
[ Hydro spill tables ] Hydro spill terms
|
|
 |
| Plant |
|
0.0005 |
|
4.0377 |
|
|
|
|
4.0382 |
| Obstructions |
|
|
|
|
|
|
|
|
0.000 |
| High Flow |
|
|
|
|
|
|
|
|
0.000 |
| Regulatory |
0.2612 |
|
|
|
|
|
|
|
0.2612 |
| Contractual |
|
|
|
|
|
|
|
|
0.000 |
| Recreational |
|
|
|
|
|
|
|
|
0.000 |
| Economic |
|
|
|
|
|
|
|
|
0.000 |
| Transmission Constraint |
|
|
|
|
|
|
1.0591 |
0.2259 |
1.285 |
| Hydraulic Constraint |
|
|
|
|
|
0.2533 |
|
|
0.2533 |
| Other |
|
|
|
|
|
|
|
|
0.000 |
| Total Energy lost due to Spill |
0.261 |
0.001 |
0.000 |
4.038 |
0.000 |
0.253 |
1.059 |
0.226 |
5.838 |
| Hydro Energy Produced |
9.00 |
10.11 |
6.95 |
8.07 |
20.86 |
5.26 |
19.06 |
11.30 |
90.61 |
| % Energy lost due to Spill |
2.9% |
0.00% |
0.00% |
50.0% |
0.00% |
4.8% |
5.6% |
2.0% |
6.4% |
|
|
|
|
09 September 2010
09 September 2010
31 August 2010
|