Hydro Spill Tables
[ Hydro spill tables ] Hydro spill terms
|
|
 |
| Plant |
|
0.3772 |
|
1.7389 |
0.0036 |
|
|
|
2.1197 |
| Obstructions |
|
|
|
|
|
|
|
|
0.000 |
| High Flow |
|
|
|
|
|
|
|
|
0.000 |
| Regulatory |
0.26 |
|
|
|
|
|
|
|
0.26 |
| Contractual |
|
|
|
|
|
|
|
|
0.000 |
| Recreational |
|
|
|
|
|
|
|
|
0.000 |
| Economic |
|
|
|
|
|
|
|
|
0.000 |
| Transmission Constraint |
|
|
|
|
|
|
|
|
0.000 |
| Hydraulic Constraint |
|
|
|
|
|
|
|
|
0.000 |
| Other |
|
|
|
|
|
|
|
|
0.000 |
| Total Energy lost due to Spill |
0.260 |
0.377 |
0.000 |
1.739 |
0.004 |
0.000 |
0.000 |
0.000 |
2.380 |
| Hydro Energy Produced |
7.03 |
7.76 |
5.64 |
8.06 |
16.16 |
4.26 |
15.46 |
9.23 |
73.60 |
| % Energy lost due to Spill |
3.7% |
4.9% |
0.00% |
21.6% |
0.00% |
0.00% |
0.00% |
0.00% |
3.2% |
|
|
|
|
Click here to view the 2009 Interim Report.
03 March 2010
22 February 2010
19 February 2010
|